Like I said it falls apart on its edges but for most people it’s probably a better understanding of it than they will ever have or need, but most people scrolling thru Lemmy probably don’t need to be understanding electrical concepts like electrons not actually flowing, charge, etc. I’m a controls engineer and while I am aware of the concepts and such, I am not designing electronics so at the end of the day I barely have a use for half of the concepts myself. Sure I could get down to the half semester class of quantum where things get weird, but that won’t easily tell people to not to try to plug their fridge into a car battery
“is usually written by an over worked engineer”
I’m in this post and I don’t like it.
But really these scada systems are rarely well defined by the time implementation happens. Often the architect has a great plan, but by the time it’s passed to a manager, a non-software engineer, to the product engineer to the automation team to the contractor the end result is “X data is pushed in With Y form and we use either a,b,or c date time stamp any nobody knows”